Slide background

Top ENR Ranking for over a Decade

RECON has been an industry leader in supply services ranging from soil improvement, groundwater
control, industrial demolition, waste treatment and landfill construction.

Slide background

Construction of North America’s
Largest Slurry Wall

12 km long with depths of 185 feet. See how we constructed the largest slurry wall ever built in North America.

Slide background

Celebrating 25 years

Over $1.4B of remediation work and over 6,000 environmental and geotechnical projects completed to date.

Slide background

Site developer for the largest Natural Gas Liquification Plant ever built in North America

RECON is stabilizing 1,800,000 cubic yards of dredge spoils and moving 700,000 cubic yards of earth to prepare a COE dredge pile for the construction of an $8B gas liquefaction facility.

Slide background

Alliance with the Petrochemical Industry Grows

4 of the top petrochemical companies in North America depend on RECON, dating back to our first MSA contract with Chevron in 1992.

Slide background

More than 10,000,000 yds³ of sludge,
sediment and soil stabilized

Our success is tied to patented techniques that lower cost and increase performance of dredge spoils, sediments, sludge and soil.

Service Offerings
Industries Served

Why Choose RECON?

Remedial Construction Services, L.P. (RECON) is a national environmental remediation, geotechnical construction, and civil construction contractor founded in 1989. We are a national leader in environmental remediation services, including soil remediation, soil stabilization and solidification, landfill cap and cell construction, permeable reactive barriers, biopolymer trenches and demolition of hazardous waste sites.

Our geotechnical division specializes in the construction of groundwater cut off walls, earth retention systems, and soil modification techniques.  We focus on helping clients solve their large, complex problems by leveraging our extensive project and industry experience, specialized equipment fleet, and patented technologies. We have helped our clients avoid downtime costs and save over $20 million in project costs.

 

→ 10+ years ranking on the ENR Top 600

→ 25 years of experience

→ Over 6,000 successfully completed projects

→ Over 400 pieces of heavy specialized equipment

→ Over 10,500,000 square feet of slurry trenches completed to date

→ 20+ Superfund sites remediated to date

→ 45,000,000 + gallons of hazardous liquids treated to date

The Latest
Featured Projects
  • Soil Remediation2
  • Sheet Piling77
  • Site Restoration
  • Demolition8
  • Soil Remediation5
  • Sludge Solidification