RECON was awarded this project after presenting and receiving approval from the EPA on our technical approach plan.

- Imported approximately 1,185,000 cubic yards of onsite borrowed material
- Installed 27-inch cap over regraded tailings area
- Constructed 20,000 linear feet of channels and swales
- Constructed three concrete cutoff walls and interim ponds
- Constructed crest berm with fill material generated from borrow areas
- Restored over 275 acres of disturbed area
Project facts
Owner(s)
Confidential
Keller business unit(s)
RECON
Main contractor(s)
Confidential