Since 2013, RECON has worked on reclaiming this former mine site. 

trucks on site
  • Performed mass grading sitewide
  • Decommissioned over 20 ponds and stabilized over 1,000 acres
  • Constructed over 9 miles of armored drainage channels
  • Installed and maintained erosion control features sitewide
  • Successfully achieved over $1,000,000 in cost savings to the client and cost avoidances initiatives
  • Relocated and placed over 750,000 cubic yards of material
  • Over 490,000 labor hours with no OSHA recordable or serious incident