Since 2013, RECON has worked on reclaiming this former mine site.
- Performed mass grading sitewide
- Decommissioned over 20 ponds and stabilized over 1,000 acres
- Constructed over 9 miles of armored drainage channels
- Installed and maintained erosion control features sitewide
- Successfully achieved over $1,000,000 in cost savings to the client and cost avoidances initiatives
- Relocated and placed over 750,000 cubic yards of material
- Over 490,000 labor hours with no OSHA recordable or serious incident