RECON has constructed 15 landfill cells and installed over 220 acres of landfill caps. These structures have included compacted clay, HDPE liner, geotextiles, geocomposites, soil, and vegetative cover. Cell construction and final containment system covers are executed with off-road and on-road owned equipment.
RECON constructed a Corrective Action Management Unit (CAMU) at an El Paso, Texas refinery. The 17-acre CAMU was designed to receive contaminated soils and waste from existing onsite Solid Waste Management Units (SWMUs).

GT Omniport, a multimodal facility located in Port Arthur, Texas, is an industrial park and liquids terminal offering rail, truck, barge, pipeline and deepwater ship transloading services. The environmental remediation and civil service construction project included soil preparation, demolishing the concrete and steel structures, clearing, grubbing, crushing concrete, beneficial reuse of of crushed concrete, and soil stabilization using RECON’s patented blend of reagents.