Waste Containment

RECON has constructed 15 landfill cells and installed over 220 acres of landfill caps. These structures have included compacted clay, HDPE liner, geotextiles, geocomposites, soil, and vegetative cover. Cell construction and final containment system covers are executed with off-road and on-road owned equipment.

Waste Containment

RECON constructed a Corrective Action Management Unit (CAMU) at an El Paso, Texas refinery. The 17-acre CAMU was designed to receive contaminated soils and waste from existing onsite Solid Waste Management Units (SWMUs).

Project Features
  • Excavating and stockpiling soils from half of the CAMU and installing GCL and 60-mil HDPE liner
  • Returning the material to the CAMU, followed by the remaining material from the CAMU
  • Constructing the rest of the CAMU to accept over 400,000 cubic yards of material excavated from the SWMUs and an additional 108,200 cubic yards of material from the property
  • Covering the CAMU with 545,000 square feet of GCL and 60-mil HDPE and a rock cover.