A substantial percentage of our project work has included impacted or hazardous waste removals and associated decommissioning and demolition. RECON performs surgical and mass removal of impacted media, including above and below ground structures and piping; concrete supports; and associated production buildings. This impacted media has included Radiological, NORM, and mixed waste.
We employ emissions control systems, from temporary cover agents, up to fully enclosed negative-air structures, at sensitive remediation projects. RECON employees are trained to perform work in PPE Levels B, C, and D. We provide turnkey, off-site disposal of contaminated media to appropriate disposal facilities.
Zero emission of fugitive dust, odor, target contaminants, and excessive noise is our goal on every site.
This task order was completed under an IDIQ cost reimbursable contract with Chevron EMC for environmental remediation in the U.S.

GT Omniport, a multimodal facility located in Port Arthur, Texas, is an industrial park and liquids terminal offering rail, truck, barge, pipeline and deepwater ship transloading services. The environmental remediation and civil service construction project included soil preparation, demolishing the concrete and steel structures, clearing, grubbing, crushing concrete, beneficial reuse of of crushed concrete, and soil stabilization using RECON’s patented blend of reagents.