The development of a construction site during civil construction projects can include the hydraulic and mechanical dredging of adjacent waterways; dewatering of onsite ponds and impoundments; and installing wick drains to control groundwater intrusions. Final site development activities typically include final site grading, development of permanent roadways and laydown yards, and the installation of underground utilities.
RECON was contracted to prepare a site for the construction of a Liquefied Natural Gas Terminal on a dredge spoil pile with low bearing capacity soils.

GT Omniport, a multimodal facility located in Port Arthur, Texas, is an industrial park and liquids terminal offering rail, truck, barge, pipeline and deepwater ship transloading services. The environmental remediation and civil service construction project included soil preparation, demolishing the concrete and steel structures, clearing, grubbing, crushing concrete, beneficial reuse of of crushed concrete, and soil stabilization using RECON’s patented blend of reagents.